 |
| |
|
|
| Towards a bright future |
|
Regin's concept for streamlining of energy consumption is aimed at reducing a property’s energy consumption through increased insight. Commitment is ensured through the active participation of the property owner and the personnel. Regin runs and is responsible for the project. Through access to our extensive network of knowledgeable integration engineers, we put together, in consultation with the property owner, the exact working group that is needed for the task. Consultants and installation engineers can also be included.
Regin and the integrator contribute competence, experience and practical solutions that provide the property owner with a more energyefficient property. All three of them win. This is why the concept is called Regin W3.
With the implementation of last of the five stages, Regin's responsibility for the project is transferred to a property energy group, which carries on with the work.
|
|
Arrigo – the universal portal
Arrigo is a universal portal that ties together the property's technical and administrative systems. In principle, all of the data and functions concerning the property are accessible through direct links and search functions. From Arrigo, it is possible to connect directly to EXO 4 (Regin's SCADA system) or other systems in a common interface. There is automatic access to alarm lists and error reports. It is possible to supervise the operation, read off the energy consumption, etc. At the same time, Arrigo is a practical tool for planning, initialisation, as well as follow-up on service and maintenance.
Through Arrigo, it is also possible to access technical documentation, relationship documentation, inspection reports, energy declarations, etc. |
|
 |
|

Stages of the energy project
1. Startup and planning
2. Analysis of the current situation, data collection, inspection
3. Processing of ideas for energy-efficient measures
4. Implementation of designated measures
5. Evaluation and startup of internal energy group
6. The property owner's working group carries on with the project |
|